Background

The client acquired 60% stake to become the largest operator of the Orinduik block. The gave the client to explore the oil and Gas potential in the Guyana oilfields. During the exploration ,the Client spudded the Jethro-1 in early July, using the Stena Forth drillship. It was drilled to a Total Depth of 4,400m meters in approximately 1,350 meters of water.

The client needed a very robust IT system to support the drilling campaign after the Stena Forth drillship had sailed from the Ghanaian oil field without any IT Infrastructure.

Successful Exploration Campaign

LIRANZ LIMITED installed and configured IT infrastructure in the stena forth for the drillship for the exploration campaign.  The team also coordinated the third party vendors for vsat and other ancillary it services for the drillship.  During the drilling, the team provided the requisite and effective IT services for the exploration crew. After the drilling, the team was also on hand to demobilize the entire infrastructure for the client.

This resulted in a smooth an  d successful IS support  minimal to no downtime for the entire drilling and exploration process.